There were two types of field tests, the land test and the ocean test.  They were conducted in order to ensure that the buoy met all requirements.  During these tests, the interval between transmissions was reduced from 30 seconds to 10 seconds for testing purposes.  The following links contain more detail about each of the tests.  Note that they are listed in the order that they were conducted.